WhatsApp



3 Marla House Construction Cost in Lahore

Total Cost

65.28 Lakh

Grey Structure Material Cost

30.4 Lakh

Finishing Material Cost

28.87 Lakh

Labour Cost

6.01 Lakh

Price Per Sq Ft

5,373

Breakdown of Overall Construction Cost By Percentage (PKR)

Plumbing Works

5.15 Lakh

Electrical Works

7.62 Lakh

Wood, Metal & Tile Works

17.75 Lakh

Fittings & Fixtures

4.71 Lakh

Foundation & Structure

30.07 Lakh

Plumbing Works

Plumbing works include underground piping and drainage systems materials.

5.15 Lakh

AC Drainage System 8.86 Thousand
Cold and Hot Water Supply 30.3 Thousand
Drainage System Piping 41.49 Thousand
Gas Piping 38.44 Thousand
Insulation Armaflex 19.68 Thousand
Pumps and Drains 3.01 Lakh
UPVC Pipeline for Sewerage System 21 Thousand
Labor Cost 53.46 Thousand

Electrical Works

Electrical works include underground wiring and all electrical items.

7.62 Lakh

Grey Structure 1.03 Lakh
Finishing 6.59 Lakh
Conduits & Accessories 31.58 Thousand
Lights, Fans and Chandeliers 2.3 Lakh
Switches and Back Boxes 1.87 Lakh
Wires & Cables 2.58 Lakh
Labor Cost 55.89 Thousand

Wood, Metal and Tile Works

Wood, Metal & Tile Works include cabinets, wardrobes, flooring, and all aluminum and iron works.

17.75 Lakh

Metal Works 1.87 Lakh
Paint and Ceiling Works 3.36 Lakh
Tile Work 6.39 Lakh
Wardrobes & Cabinets 4.41 Lakh
Windows 1.73 Lakh

Fittings & Fixtures

Fittings & Fixtures include kitchen and bath accessories.

4.71 Lakh

Bathroom 3.78 Lakh
Geyser & Manhole 37.2 Thousand
Kitchen 55 Thousand

Foundation & Structure

Foundation & Structure includes materials for the basic house structure including foundation, floors, walls, roofing, and plastering.

30.07 Lakh

Bricks, Cement, Sand, & Crush 19.42 Lakh
Excavation & Steel Reinforcement 5.37 Lakh
Roof Insulation, Termite & Water Proofing 35.98 Thousand
Labor Cost 4.92 Lakh

Disclaimer

This cost is for 3 Marla double storey House. All the information in this calculator is published for general information purpose only. All product prices are subject to change according to the market fluctuation and may not be 100% accurate.