WhatsApp



5 Marla House Construction Cost in Islamabad

Total Cost

110.40 Lakh

Grey Structure Material Cost

53.00 Lakh

Finishing Material Cost

46.80 Lakh

Labour Cost

10.60 Lakh

Price Per Sq Ft

5,500

Breakdown of Overall Construction Cost By Percentage (PKR)

Plumbing Works

8.60 Lakh

Electrical Works

13.20 Lakh

Wood, Metal & Tile Works

29.50 Lakh

Fittings & Fixtures

8.10 Lakh

Foundation & Structure

51.00 Lakh

Plumbing Works

Includes underground piping and drainage systems.

8.60 Lakh

AC Drainage 15 Thousand
Hot & Cold Water 50 Thousand
Drainage Piping 1.2 Lakh
Gas Piping 70 Thousand
Pumps & Drains 5.7 Lakh
UPVC Sewerage 30 Thousand
Labor Cost 75 Thousand

Electrical Works

Includes underground wiring and all electrical items.

13.20 Lakh

Grey Structure 2.25 Lakh
Finishing 10.95 Lakh
Conduits & Accessories 55 Thousand
Lights & Fans 3.3 Lakh
Switches & Back Boxes 2.1 Lakh
Wires & Cables 4.5 Lakh
Labor Cost 80 Thousand

Wood, Metal & Tile Works

Cabinets, wardrobes, flooring, aluminum, and iron works.

29.50 Lakh

Metal Works 3 Lakh
Paint & Ceiling 5.5 Lakh
Tile Work 10 Lakh
Wardrobes & Cabinets 7.5 Lakh
Windows 3.5 Lakh

Fittings & Fixtures

Kitchen and bathroom accessories.

8.10 Lakh

Bathroom 5.9 Lakh
Geyser & Manhole 65 Thousand
Kitchen 1.55 Lakh

Foundation & Structure

Materials for basic house structure: foundation, walls, roofing, plaster.

51.00 Lakh

Bricks, Cement, Sand, Crush 33 Lakh
Excavation & Steel 10.5 Lakh
Roof Insulation & Waterproofing 80 Thousand
Labor Cost 6.7 Lakh

Disclaimer

These figures are for a 5 Marla double-story House in Islamabad. Actual costs may differ based on construction methods and market fluctuations.