WhatsApp



5 Marla House Construction Cost in Lahore

Total Cost

105.75 Lakh

Grey Structure Material Cost

50.5 Lakh

Finishing Material Cost

44.8 Lakh

Labour Cost

10.45 Lakh

Price Per Sq Ft

5,450

Breakdown of Overall Construction Cost By Percentage (PKR)

Plumbing Works

8.25 Lakh

Electrical Works

12.30 Lakh

Wood, Metal & Tile Works

28.40 Lakh

Fittings & Fixtures

7.90 Lakh

Foundation & Structure

48.90 Lakh

Plumbing Works

Plumbing works include underground piping and drainage systems materials.

8.25 Lakh

AC Drainage System 15 Thousand
Cold and Hot Water Supply 45 Thousand
Drainage System Piping 1.1 Lakh
Gas Piping 65 Thousand
Insulation Armaflex 30 Thousand
Pumps and Drains 5.5 Lakh
UPVC Pipeline for Sewerage System 24 Thousand
Labor Cost 70 Thousand

Electrical Works

Electrical works include underground wiring and all electrical items.

12.30 Lakh

Grey Structure 2.10 Lakh
Finishing 10.20 Lakh
Conduits & Accessories 50 Thousand
Lights, Fans & Chandeliers 3 Lakh
Switches & Back Boxes 2 Lakh
Wires & Cables 4.2 Lakh
Labor Cost 90 Thousand

Wood, Metal and Tile Works

Wood, Metal & Tile Works include cabinets, wardrobes, flooring, and all aluminum and iron works.

28.40 Lakh

Metal Works 2.8 Lakh
Paint & Ceiling Works 5.3 Lakh
Tile Work 9.2 Lakh
Wardrobes & Cabinets 7.1 Lakh
Windows 4 Lakh

Fittings & Fixtures

Fittings & Fixtures include kitchen and bath accessories.

7.90 Lakh

Bathroom 5.8 Lakh
Geyser & Manhole 60 Thousand
Kitchen 1.5 Lakh

Foundation & Structure

Foundation & Structure includes materials for the basic house structure including foundation, floors, walls, roofing, and plastering.

48.90 Lakh

Bricks, Cement, Sand, & Crush 32 Lakh
Excavation & Steel Reinforcement 9.5 Lakh
Roof Insulation, Termite & Water Proofing 70 Thousand
Labor Cost 6.7 Lakh

Disclaimer

This cost is for a 5 Marla double storey House. All the information is for general guidance only. Product prices fluctuate according to market conditions and may not be 100% accurate.